1.It is generally advised to place the PLC control cabinet on any place of the platform where distance from the Servo motor no more than 5 meters. The specific location according to site conditions and customer preferences.
2.The customer should charge power supply to the PLC control cabinet and the first take-up machine (three-phase four-wire 380V 50HZ). Power switching is not needed,because the machine has voltage regulator with it.The shielded wires connecting control cabinet and casting machine/take-up machine are already provided by us, you need’t buy them.
3.Copper machine using the expansion bolt to fix. And the equipment with expansion bolts, you need’t to buy them.
4.Customers need to prepare the external power supply (three phase four wire) to PLC control cabinet and the first take up machine which near the furnace , the specific length is measured according to the power supply position.
5. We have provide the cable wires between the PLC control cabinet and continuous casting machine, the shielding wire between the PLC control cabinet and line frame, the shielding wire/ connecting wire and cable wire between line frame and copper machine. You don’t need to buy them.